MIL-PRF-87978A
4.2 Qualification inspection. Qualification tests shall consist of all of the tests specified in 4.5.
4.2.1 Qualification procedures. Upon successful completion of all testing requirements as
specified herein, the contractor shall provide a certified qualification test report showing that the
material conforms to all requirements of this document. The report shall be forwarded to WR-
ALC/LKJE, 460 2ND ST, STE 221, ROBINS AFB, GA 31098-1640. Upon review and
acceptance of the test report, the government will add the product to the Qualified Products List.
4.2.2 Qualification test report. The qualification test report shall include complete data, in the
contractor's format, describing the method of performance of each test and definitive results to
verify that the material conforms to all requirements of this specification. The report shall also
include complete formulation data identifying each ingredient of the remover by chemical or
proprietary name.
4.3 Conformance inspection. Conformance inspection for acceptance of individual lots shall
consist of sampling and inspection in accordance with 4.3.1 and tests in accordance with 4.5.1 and
4.5.4.
4.3.1 Sampling and Inspection.
4.3.1.1 Sampling for inspection of filled containers. A random sample of filled containers shall be
selected from each lot in accordance with ANSI/ASQC Z1.4-1993.
4.3.1.2 Inspection of filled containers. Each filled container selected in accordance with 4.3.1.1
shall be examined for defects of the container and the seal for evidence of leakage, and for
unsatisfactory marking. Each sample filled container shall also be weighed to determine the
amount of contents. Any container in the sample, having one or more defects, or under required
fill, shall be rejected and if the number of defective containers in any sample exceeds the
acceptance number for the applicable sample plan of ANSI/ASQC Z1.4-1993, the lot represented
by the sample shall be rejected.
4.3.1.3 Sampling for tests. Two containers of Type I paint remover shall be selected at random
from each inspection lot. Four containers of Type II paint remover (two paint remover A and two
paint remover B) shall be selected at random from each inspection lot. If more than one lot is
represented in the shipment, each lot represented shall be treated as a separate shipment for
sampling purposes. The contents of each container having been selected at random for sampling
shall be thoroughly mixed immediately prior to testing. Each sample shall be tested to determine
compliance with this specification.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business