TT-P-1757B
removal from the fluid, the primer coating and topcoat shall exhibit no softening, wrinkling, blistering, loss of adhesion, or other coating deficiency.
3.6.1.3 Hydrocarbon resistance - flexibility. The primer coating, with and without a topcoat, shall exhibit no cracking or flaking, when tested in accordance with 4.6.8.2.
3.6.2 Water resistance.
3.6.2.1 Primer coating. The primer coating shall exhibit no blistering or other surface defect, when tested in accordance with 4.6.8.3.1.
3.6.2.2 Primer coating and topcoat. The topcoated primer coating shall exhibit no blistering or other surface defect, when tested in accordance with 4.6.8.3.2.
3.6.3 Salt spray resistance. The primer coating shall not lift, blister, or cause substrate corrosion when tested in accordance with 4.6.9.
3.7 Accelerated weathering. The primer coating, with and without a topcoat, shall exhibit no cracking, checking, or embrittlement, nor loss of corrosion protection properties or loss of adhesion, when tested in accordance with 4.6.10 through 4.6.10.3.
3.8 Storage stability. The primer coating shall meet all the requirements of this specification after a minimum storage period of 365 days (one year) from the date of manufacture under the following conditions:
a. The daily mean ambient air temperature at the storage facility is 35 to 95°F (1.7 to 35°C). b. The peak ambient air temperature at the storage facility does not exceed 115°F (46°C).
3.9 Workmanship. The ingredients, workmanship, and processing of this primer coating shall be such that all the requirements of this specification are met.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the contract, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services
conform to prescribed requirements.
4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and
5. The inspection set forth in this specification shall become a part of the contractor's overall
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business